Proton engineers/designers want to start the facelift plan now to have the ability to start in 2 or 2 and half years from now. Don’t repeat exact oversight with preve (by now four yrs but no facelift, several problems such as melting wire, engine mounting, cooler pipe, CVT and turbo) https://sagacvt28494.theideasblog.com/34949723/the-5-second-trick-for-saga-cvt