1

High-Efficiency 400 kW Chiller Installation Achieves £50,000 Yearly Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Installation Overview At a prominent confectionery site in York, Newsome has commissioned a high-capacity 400 kW chiller, marking the successful realisation of the project. Designed to reinforce ESG targets, the installation boosts process efficiency while lowering overall power consumption and CO₂ levels. https://social-medialink.com/story5747588/energy-efficient-400-kw-chiller-installation-delivers-50-000-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story